One certificate corresponds to one tonne of carbon dioxide equivalent emissions. €82.32 is therefore a carbon price, not a charge per tonne of stainless steel. The financial effect on an order also depends on its embedded emissions and the applicable adjustments, including EU ETS free allocation and any eligible carbon price already paid.
The Q3 figure should not be treated as the confirmed price for goods imported into the EU in Q4 2026. The Commission currently lists 4 January 2027 as the Q4 publication date; its price table does not yet show a Q4 value.
When comparing quotations, keep the material price separate from any estimated CBAM liability. Check which emissions figures the estimate uses and what supporting records the producer can provide. Then confirm the CN code for the goods you intend to import.
Stainless steel product headings to check
CBAM scope follows the CN code, the EU customs classification for the goods. Common headings for stainless steel are listed below. Confirm the full eight-digit code for the actual item with the EU importer or customs representative against the current CBAM Annex I.
Scroll horizontally to see every column.
| Product | Common CN heading | Classification detail |
|---|---|---|
| Plate, sheet, coil and strip | 7219 or 7220 | Flat-rolled stainless steel 600 mm wide or more falls under 7219; less than 600 mm under 7220. |
| Bars, rods and sections | 7221 or 7222 | 7221 covers hot-rolled rod in irregularly wound coils; other stainless bars, rods and sections fall under 7222. |
| Seamless pipe and tube | 7304 | Confirm material, dimensions and the applicable subheading. |
| Welded circular pipe over 406.4 mm outside diameter | 7305 | Circular cross-section and outside diameter above 406.4 mm are key conditions. |
| Other welded pipe, tube and hollow sections | 7306 | Confirm cross-section, construction and dimensions; distinguish from 7305. |
| Flanges and pipe fittings | 7307 | The fitting type determines the subheading. |
| Forgings and custom parts | Item-specific | Possible headings include 7218, 7222, 7307 or 7326. Some finished machinery parts may fall outside current CBAM scope. |
For forgings, distinguish semi-finished stock from finished components before assigning a CN code. A component’s function and degree of processing can affect its classification; the grade alone does not determine whether it is covered. The Commission’s iron and steel guidance explains the sector’s covered goods and production processes.
Review the annual threshold and declaration dates
The current mass-based threshold is 50 tonnes of net mass per importer per calendar year, aggregated across covered iron and steel, aluminium, cement and fertiliser goods. If that total is exceeded, the relevant CBAM obligations apply to all covered imports during the year, including earlier shipments. Electricity and hydrogen are excluded from this threshold exemption.
Certificates for 2026 imports become available for purchase from February 2027. The first annual declaration and corresponding certificate surrender are due by 30 September 2027. Keep customs entry records and net weights available for reconciliation with the declaration.
Plan the emissions evidence before ordering
Under the verification rules, importers can use Commission default values or actual verified emissions, subject to the applicable requirements. For actual values, the non-EU production installation calculates the emissions and an accredited CBAM verifier checks the calculation and supporting evidence. The authorised declarant uses the verified data for its declaration.
A material test certificate helps identify the material and its heat or lot. Actual emissions require separate installation-level data and accredited verification. If you intend to use actual values, establish whether the relevant producer can supply the required evidence before committing to the order.
The Commission’s timeline provides for the first verification reports to be issued from January 2027. During 2026, buyers can ask about installation identification, monitoring arrangements and verification plans without expecting a completed annual report at the quotation stage.
Prepare the records for each covered shipment
Before purchase, agree on the information needed for the specific goods:
- the confirmed eight-digit CN code, origin and expected net mass;
- the production installation and planned emissions reporting method;
- the material and heat or lot references linking the goods to their records; and
- who supplies each required document, in which format and by what date.
If an order combines stock from different sources, keep each batch linked to its records. A single commercial invoice does not establish that all goods came from one production installation.