Quality Documents, Certificates & Inspection

Plan order-specific MTC, traceability, third-party inspection and claim requirements while reviewing the separate Kongfang Metal management-system certificates.

Documents you can request

Put the document package in the RFQ and purchase order so the proposed material and inspection route includes it from the start. Depending on the order, buyers can request an MTC type, heat or lot traceability, dimensional and test reports, third-party inspection records, marking records and packing-release documents.

  • Name EN 10204 3.1 when that inspection-document type is required.
  • State the material tests, supplementary tests and reporting language required by the order.
  • Identify drawing dimensions, surfaces, NDT, PMI and witness or hold points to be recorded.
  • Define how heat or lot traceability must continue through cutting, fabrication and packing.

Management-system certificates held by Kongfang Metal

The sole certificate holder shown on these documents is Wuxi Kongfang Metal Products Co., Ltd.

Material and inspection documents are prepared for the requirements of each order.

They do not certify Wuxi Hechuang Stainless Steel Co., Ltd. or the Hechuang Stainless Steel brand. Wuxi Kongfang Metal Products Co., Ltd. is the parent company, but that relationship does not extend the certificates’ holder or scope. Kongfang Metal management-system certificates are not order-specific material documents.

Ji Dejin of Kongfang Metal Group at a stainless-steel dimensional inspection station

Kongfang Metal Group Team

Inspection requirements considered early

Ji Dejin manages quality control for Kongfang Metal Group. That quality perspective helps Hechuang Stainless Steel buyers define inspection, traceability and document requirements early enough to match them to the proposed supply route.

Ji DejinQuality Control Manager

View official group profile

ISO 9001:2015

04626Q03962R001
Valid through 2029-07-06

Sales of Stainless Steel Materials and Products

Download Kongfang Metal certificate

ISO 14001:2015

04626E02513R001
Valid through 2029-07-06

Sales of Stainless Steel Materials and Products and Related Management Activities

Download Kongfang Metal certificate

ISO 45001:2018

04626S02353R001
Valid through 2029-07-06

Sales of Stainless Steel Materials and Products and Related Management Activities

Download Kongfang Metal certificate

Material certificates and traceability

A useful request reads: “EN 10204 3.1 inspection document required.” Add it to both the RFQ and purchase order, together with the grade, product standard, dimensions, tests, marking, document language and heat or lot traceability. We will check that package against the proposed supply route before accepting the order.

Approved redacted sample

This two-page Eastern Special Steel Sample MTC shows approved 309S and 310S supply records. Customer and purchaser identities, contract and certificate numbers, item and heat identifiers, quantities, weights, contact channels and machine-readable codes have been securely removed. The mill identity, grade, standard, nominal dimensions, test labels and results, dates and seals remain so buyers can review the document layout.

The source sample does not identify itself as EN 10204 3.1, so it is not presented as a 3.1 document. Use it to review the layout only; the goods for your order need their own applicable material and traceability documents.

Download approved Sample MTC

Order-specific document review

Check the delivered documents against the purchase description, manufacturer or issuing party, grade, standard, dimensions, reported results and markings. Then match the heat, lot and product identifiers to the goods received.

Read the MTC checklist

Inspection and claims

Third-party inspection by SGS, BV, TÜV or CCIC can be arranged. State the inspection method, sampling, witness or hold points, acceptance criteria and report required. Timing and cost are then included in the quotation.

If the delivered goods or documents do not match the order, segregate the affected material and notify the sales team within the 30 days after receipt claim period. Send the order reference, item and heat or lot identification, photographs, measurements, documents and quantity affected. Retesting and settlement then follow the contract and responsibility determination.

Commercial and delivery baseline

  • MOQ: normally 1 metric ton; special orders negotiable.
  • Samples: free; customer pays freight; cut sizes available; preparation normally 3–7 days.
  • Delivery: stock 3–7 days ex-works; custom production normally 30–60 days.
  • Payment: T/T or L/C at sight.
  • Incoterms: FOB / CIF / CFR / DAP / EXW.
  • Common export ports: Shanghai / Ningbo.

Send your RFQ

Required fields are marked with an asterisk.

Up to 5 files · 10 MB each · 50 MB total. PDF, Office, images, DWG, DXF, STEP/STP and IGES/IGS.

    0 files · 0 MB

    By submitting, you agree that Hechuang Stainless Steel may use these details to respond to your request. Privacy notice.