EU melt-and-pour documentation rules have applied to covered steel imports since 1 October 2026. Before dispatch, confirm whether your stainless steel product is covered and whether its documents identify the melt-and-pour country and heat number.

Industry and Standards UpdatesPublished

The European Commission announced the requirements on 31 August 2026. Importers must declare the melt-and-pour country and provide evidence to support it.

European Commission headquarters at the Berlaymont building in Brussels
Berlaymont building, European Commission headquarters in Brussels (2016). Photo: almathias / Wikimedia Commons (CC0).

For a buyer ordering 310S plate, 309S coil or 253MA pipe, the first step is to check whether the product is covered by the regulation. The next is to confirm that the offered material can be supplied with the required evidence. A grade name or a certificate heading does not settle both questions.

Check whether your product is covered

The requirement applies to products in Annex I to Regulation EU 2026/1384. The list includes specified stainless flat products and pipe categories. It does not cover every product containing stainless steel simply because it uses a heat-resistant grade.

Have the EU importer or customs representative check the applicable Combined Nomenclature code, the EU customs classification, for the goods as supplied. Product form, dimensions, manufacturing route and processing can matter to that assessment. Do not assume that a coil, a cut blank and a finished furnace component share the same classification.

For heat-resistant material, keep the commercial description precise. State the grade, product form and ordered specification so that the material being quoted is the material being checked for import.

Verify the country and heat number

The country of melt and pour is where raw steel or iron was first produced in liquid form in a steelmaking or ironmaking furnace and then cast into its first solid state. Do not fill this field from the seller’s address, dispatch country or the location of the last cutting operation.

Under Implementing Regulation EU 2026/1963, the normal evidence is a mill test certificate (MTC) containing the melt-and-pour country and the heat number of the imported steel. The heat number identifies the melt to which the material documents relate.

Before dispatch, match the reported heat number to the material identification and packing records. For cut-to-size plate, ask how each piece or bundle will remain linked to the original heat number after cutting. If the order contains more than one heat, request records showing which material belongs to each heat.

An EN 10204 3.1 heading alone does not establish the melt-and-pour country or connect the certificate to the goods. Check the actual information and traceability, as well as the inspection-document type required by your order.

Separate incomplete certificates from missing certificates

The regulation provides different routes for an MTC that lacks information and for a shipment with no MTC. Keep that distinction when asking the supplier for documents.

Scroll horizontally to see every column.

Document situation Evidence to check Important condition
MTC includes both required identifiers Melt-and-pour country and heat number for the imported material Match the evidence to the actual goods
MTC lacks required information Listed complementary evidence that supplies the missing information Customs carries out documentary checks
No MTC is available Listed standalone evidence containing both country and heat number Temporary route through 30 September 2027, with customs documentary checks

The listed evidence includes invoices, delivery notes, certain quality or contractual records, long-term supplier declarations and production records. Their acceptability depends on the information and verifiable evidence they provide. Even a long-term supplier declaration is not automatically sufficient merely because it is signed.

From 1 October 2027, the temporary standalone route no longer applies under this regulation. Listed documents may still complement an MTC; the change does not make every supporting document invalid.

The importer declares the country using the applicable TARIC document codes. The regulation provides for rejection of the import if the country is not declared with appropriate verifiable evidence. Confirm the current declaration requirements with the importer or customs representative rather than waiting until the goods arrive.

Agree the document package before shipment

Raise these requirements when requesting a quotation, not after the material has been cut or packed. Give the supplier the destination, material description and required evidence, then ask which documents are available for the material being offered.

Before placing the order, agree who will obtain missing information and which documents will identify the supplied heats. Before dispatch, compare the material markings with the MTC and supporting records. If information is missing or inconsistent, ask the supplier for clarification and the appropriate supporting records. Do not guess the country or add details to a mill-issued certificate yourself.

Keep this traceability check separate from other import obligations. Melt-and-pour evidence does not replace the checks required for tariff treatment, sanctions or CBAM emissions reporting.

At Hechuang, we supply heat-resistant stainless steel and check mill documents and heat traceability against the agreed order. Tell us your destination and required documentation before quotation so we can confirm which documents are available for the material offered. Your importer or customs representative should confirm the declaration requirements. Customs authorities assess the submitted evidence.

Buyer questions

  • Does this requirement apply to every 310S or 309S product?

    No. Scope follows the listed product categories and customs codes, not the grade name alone. Check the actual goods, including their product form and processing, with the EU importer or customs representative.

  • Can a country of origin certificate replace melt and pour evidence?

    Do not assume so. A document stating origin may not establish the melt-and-pour country and heat number. Check whether the evidence contains the required information and whether it can be used under the applicable document route.

  • Is an EN 10204 3.1 certificate enough by itself?

    The heading alone is not enough to establish these requirements. Review the certificate's country and heat information and its connection to the imported goods. If information is missing, address the complementary-evidence requirements.

  • What if the supplier cannot provide an MTC?

    Until 30 September 2027, listed alternative documents may be considered as standalone evidence if they contain the melt-and-pour country and heat number. Customs documentary checks apply. Confirm the proposed evidence before shipment; acceptance is not automatic.

  • What changes on 1 October 2027?

    The temporary standalone-evidence option ends under the regulation. Listed documents may still be used to complement an MTC that lacks required information. Recheck the applicable rules when planning later shipments.

Confirm your material and document requirements

Send us your grade, product form, dimensions, quantity and EU destination, together with the material documents your importer requires. We will review your material requirements and confirm which documents we can supply before accepting the order.

Discuss your material and document requirements

Official sources

Send your RFQ

Required fields are marked with an asterisk.

Up to 5 files · 10 MB each · 50 MB total. PDF, Office, images, DWG, DXF, STEP/STP and IGES/IGS.

    0 files · 0 MB

    By submitting, you agree that Hechuang Stainless Steel may use these details to respond to your request. Privacy notice.